Question 10
Will the vessel reach its target before the deadline?
An initially empty cylindrical vessel has the inside dimensions shown. A pump delivers at a constant rate, but exactly of this volume is diverted before it enters the vessel. Ignore all other losses and any startup delay. The target must be reached within , inclusive.
Diagram shown in the original SVG worksheet.
Use , exact , , and . Treat all given model data as exact; leave unrounded until the final numerical step.
Find the target liquid volume in and litres. Show the distinction between diameter and radius.
Find the actual filling time in seconds and decide whether the deadline is met. Determine the minimum pump rate in that would meet the deadline with the same diversion fraction.
A preliminary calculation converts all units correctly but ignores the diversion. What time and decision result? Would a dimensional check alone detect this error?
Question 10 - Solution
Will the vessel reach its target before the deadline?
Diagram shown in the original SVG worksheet.
(a) Convert lengths before forming the volume.
The radius is half the diameter: ; . Therefore Using the diameter as radius would multiply the volume by four, a geometry error that unit cancellation would not reveal.
(b) Only the retained flow fills the vessel.
The entering rate is . Thus The deadline is not met: this exceeds . That deadline is , so the minimum pump rate is
(c) Correct units cannot replace a missing physical factor.
Ignoring diversion gives , incorrectly predicting success. Both computations have time units. The missing dimensionless retention factor is a physical-model error; a unit check alone cannot detect it.