Changing Units — Question 10

Section 1-3 · Physics pages 70–71

Question 10 Will the vessel reach its target before the deadline? An initially empty cylindrical vessel has the inside dimensions shown. A pump delivers 0.750 L/min at a constant rate, but exactly 10.0% of this volume is diverted before it enters the vessel. Ignore all other losses and any startup delay. The target must be reached within 75.0 s, inclusive. inside diameter 12.0 cm 8.0 cm 10% diverted Pump 0.750 L/min Target level shown dashed Cylindrical vessel, schematic. The stated depth is measured from the inside bottom. Ten percent of the pumped volume is diverted before entering the vessel. Use V = πr2h, exact 1 cm = 10−2 m, 1 L = 10−3 m3, and 1 min = 60 s. Treat all given model data as exact; leave π unrounded until the final numerical step. (a) Find the target liquid volume in m3 and litres. Show the distinction between diameter and radius. (b) Find the actual filling time in seconds and decide whether the deadline is met. Determine the minimum pump rate in L/min that would meet the deadline with the same diversion fraction. (c) A preliminary calculation converts all units correctly but ignores the diversion. What time and decision result? Would a dimensional check alone detect this error?
Show solutionHide solution
Question 10 - Solution Will the vessel reach its target before the deadline? inside diameter 12.0 cm 8.0 cm 10% diverted Pump 0.750 L/min Target level shown dashed (a) Convert lengths before forming the volume. The radius is half the diameter: r = 6.0 cm = 0.060 m; h = 0.080 m. Therefore V = π(0.060)2(0.080) m3 = 0.000288π m3 = 0.288π L ≈0.904779 L . Using the diameter as radius would multiply the volume by four, a geometry error that unit cancellation would not reveal. (b) Only the retained flow fills the vessel. The entering rate is (1 −0.100)(0.750 L/min) = 0.675 L/min. Thus t = 0.288π 0.675 min = 25.6π s ≈80.425 s . The deadline is not met: this exceeds 75.0 s. That deadline is 1.25 min, so the minimum pump rate is qmin = 0.288π L (0.900)(1.25 min) = 0.256π L/min ≈0.804248 L/min . (c) Correct units cannot replace a missing physical factor. tactual tignoring diversion = 1 0.900 = 10 9 , tactual −75 s ≈5.425 s. Ignoring diversion gives t = 0.288π/0.750 min = 23.04π s ≈72.382 s, incorrectly predicting success. Both computations have time units. The missing dimensionless retention factor is a physical-model error; a unit check alone cannot detect it.

Question 10

Will the vessel reach its target before the deadline?

An initially empty cylindrical vessel has the inside dimensions shown. A pump delivers 0.750L/min0.750\ \mathrm{L/min} at a constant rate, but exactly 10.0%10.0\% of this volume is diverted before it enters the vessel. Ignore all other losses and any startup delay. The target must be reached within 75.0s75.0\ \mathrm{s}, inclusive.

Diagram shown in the original SVG worksheet.

Use V=πr2hV=\pi r^2 h, exact 1cm=10−2m1\ \mathrm{cm}=10^{-2}\ \mathrm{m}, 1L=10−3m31\ \mathrm{L}=10^{-3}\ \mathrm{m^3}, and 1min=60s1\ \mathrm{min}=60\ \mathrm{s}. Treat all given model data as exact; leave π\pi unrounded until the final numerical step.

  1. Find the target liquid volume in m3\mathrm{m^3} and litres. Show the distinction between diameter and radius.

  2. Find the actual filling time in seconds and decide whether the deadline is met. Determine the minimum pump rate in L/min\mathrm{L/min} that would meet the deadline with the same diversion fraction.

  3. A preliminary calculation converts all units correctly but ignores the diversion. What time and decision result? Would a dimensional check alone detect this error?

Question 10 - Solution

Will the vessel reach its target before the deadline?

Diagram shown in the original SVG worksheet.

(a) Convert lengths before forming the volume.

The radius is half the diameter: r=6.0cm=0.060mr=6.0\ \mathrm{cm}=0.060\ \mathrm{m}; h=0.080mh=0.080\ \mathrm{m}. Therefore V=π(0.060)2(0.080)m3=0.000288πm3=0.288πL≈0.904779L.V=\pi(0.060)^2(0.080)\ \mathrm{m^3} =0.000288\pi\ \mathrm{m^3}=0.288\pi\ \mathrm{L} \approx\boxed{0.904779\ \mathrm{L}}. Using the diameter as radius would multiply the volume by four, a geometry error that unit cancellation would not reveal.

(b) Only the retained flow fills the vessel.

The entering rate is (1−0.100)(0.750L/min)=0.675L/min(1-0.100)(0.750\ \mathrm{L/min})=0.675\ \mathrm{L/min}. Thus t=0.288π0.675min=25.6πs≈80.425s.t=\frac{0.288\pi}{0.675}\ \mathrm{min} =25.6\pi\ \mathrm{s}\approx\boxed{80.425\ \mathrm{s}}. The deadline is not met: this exceeds 75.0s75.0\ \mathrm{s}. That deadline is 1.25min1.25\ \mathrm{min}, so the minimum pump rate is qmin=0.288πL(0.900)(1.25min)=0.256πL/min≈0.804248L/min.q_{\min}=\frac{0.288\pi\ \mathrm{L}}{(0.900)(1.25\ \mathrm{min})} =0.256\pi\ \mathrm{L/min}\approx\boxed{0.804248\ \mathrm{L/min}}.

(c) Correct units cannot replace a missing physical factor.

tactualtignoringdiversion=10.900=109,tactual−75s≈5.425s.\frac{t_{\mathrm{actual}}}{t_{\mathrm{ignoring\ diversion}}}=\frac1{0.900}=\frac{10}{9},\qquad t_{\mathrm{actual}}-75\ \mathrm s\approx5.425\ \mathrm s.

Ignoring diversion gives t=0.288π/0.750min=23.04πs≈72.382st=0.288\pi/0.750\ \mathrm{min} =23.04\pi\ \mathrm{s}\approx72.382\ \mathrm{s}, incorrectly predicting success. Both computations have time units. The missing dimensionless retention factor is a physical-model error; a unit check alone cannot detect it.