Electric Current — Question 5

Section 26-1 · Physics pages 4160–4161

Question 5 A drifting instrument zero biases a finite current measurement A sensor reports Im(t) = I(t) + b0 + kt over 0 ≤t ≤T. Independent calibration gives the offsets b0 and bT at the endpoints; the offset varies linearly. t b b0 bT Axes and labels specify the model; the sketch is schematic. (a) Express the actual transported charge in terms of the measured integral and calibrations. (b) For a measured integral 120 mC, T=20 s, b0 = 1.0 mA and bT = 3.0 mA, find actual charge and average current.
Show solutionHide solution
Question 5 - Solution A drifting instrument zero biases a finite current measurement t b b0 bT (a) Method and calculation k = (bT −b0)/T, Qm = ∫T 0 Im dt. Q = Qm −b0T −kT 2/2 = Qm −1 2(b0 + bT )T. (b) Interpretation and further calculation Q = 120 −1 2(1 + 3)(20) = 80.0 mC. I = Q/T = 4.00 mA. Physical check The correction is the area under the offset curve, not just the final offset multiplied by time.

Question 5

A drifting instrument zero biases a finite current measurement

A sensor reports Im(t)=I(t)+b0+ktI_m(t)=I(t)+b_0+kt over 0≤t≤T0\le t\le T. Independent calibration gives the offsets b0b_0 and bTb_T at the endpoints; the offset varies linearly.

Diagram shown in the original SVG worksheet.

  1. Express the actual transported charge in terms of the measured integral and calibrations.

  2. For a measured integral 120 mC, T=20 s, b0=1.0b_0=1.0 mA and bT=3.0b_T=3.0 mA, find actual charge and average current.

Question 5 - Solution

A drifting instrument zero biases a finite current measurement

Diagram shown in the original SVG worksheet.

(a) Method and calculation

k=(bT−b0)/T,Qm=∫0TImdt.k=(b_T-b_0)/T,\quad Q_m=\int_0^T I_m\,dt.Q=Qm−b0T−kT2/2=Qm−12(b0+bT)T.Q=Q_m-b_0T-kT^2/2=Q_m-\tfrac12(b_0+b_T)T.

(b) Interpretation and further calculation

Q=120−12(1+3)(20)=80.0mC.Q=120-\tfrac12(1+3)(20)=80.0\,\mathrm{mC}.I¯=Q/T=4.00mA.\overline I=Q/T=4.00\,\mathrm{mA}.

Physical check

The correction is the area under the offset curve, not just the final offset multiplied by time.